|
Home Feature Product Tech Support ICT Catalogue Mailing List Case Studies Salinity Tall Trees Waste Water Videos 2nd-hand Sales
Thursday August 21, 2008
|
Time of the last Irrigation in CottonIrrigation Strategy 1990/91(see Figure 1)
Figure 1. Buttabone Field 1 1990/91 season.
Figure 2. Soil moisture profiles before and after sealing.Timing of last irrigation.The field showed right throughout the season that falling below the refill point would rapidly lead to stressed plants. When the crop was below refill point for example 6/2 or 24/2 the plants wilted. The root had not developed throughout the season to overcome compaction or sodic subsoil effects. Therefore to get as much yield out of the field as possible and to ensure plants were not stressed at defoliation the plan was to have the field at refill the day of defoliation. This meant that it was important to identify the last effective flower (LEF) and try to determine the date at which it would be mature enough to defoliate. The LEF was determined as being on 4/2/91. Then it had to be decided how many days it would take for the LEF to mature. Greg Constable indicated that 550 growing day degrees (GDD) was a reasonable average number of heat units required to take a flower to maturity. Data from last year (see table 1) also supports this value. Based on long term average weather data the calendar days required to get 550 GDDs for Trangie and Narrabri are set out in Table 2. Since there is no long term weather data for Buttabone it is assumed to be the average of Trangie and Narrabri. The LEF at 4/2/91 gave a predicted defoliation date of 22/3/91. However a combination of hot weather and tight soils appeared to cause the last 2-3 bolls to stop growing. This brought the LEF back to 30/1/91 and given average weather a date of defoliation of 12/3/91. From 30/1/91 to 28/2/91 the weather was hot and there were 450 GDDs which is approximately 50 above average This meant that last bolls would be mature by 7/3/91 and field observations confirmed this date. Therefore last irrigation was applied on 28/2/91 and with a crop water use of 6 mm/day the crop should have used the 42 mm of available water and been at refill on 7/3/91 the planned defoliation date. Table 1. Growing day degrees from last effective flower to first defoliation on Buttabone in 1990.
Table 2. Calendar day to get 550 growing day degrees at Trangie and Narrabri.
Printer Friendly Version (PDF) © 2003-2008, ICT International |